0878 - Use of Entry Capacity Holdings at Easington at the Rough Storage ASEP in Winter 2024/2025

Last updated: 
25 June, 2024
Current version
1.0
Proposer
Centrica Energy Storage Ltd
Impacted codes
None
Modification type
Authority Direction
Status:
Allocated to Workgroup
Impact:
Low impact: National Gas Transmission, Shippers
High impact: Centrica Storage Limited, Rough Storage

This Modification Proposal will ensure entry capacity holdings at the Easington Aggregated System Entry Point (ASEP) can be utilised at the Rough Storage ASEP during Winter 2024/25 in the same way as they were during Winter 2022/23 and Winter 2023/24. An enhancement has been proposed to permit any User which secures Rough Storage Capacity can redesignate Easington Entry Capacity to the Rough ASEP.

Timeline

Raised
Yes
20/05/2024
Panel Assessment
Yes
20/06/2024
Workgroup Report Due
No
18/07/2024
Consultation
Expected
19/07/2024
09/08/2024
Consultation - Final Modification Report
No
10/08/2024
Panel Decision
No
15/08/2024
Implementation
Unset