0851R - Extending the Annually Read PC4 Supply Meter Point (SMP) read submission window

Last updated: 
14 June, 2024
Current version
1.0
Proposer
OVO Energy
Impacted codes
IGT UNC, REC
Modification type
Request
Status:
Allocated to Workgroup
Impact:
Low impact: Distribution Network Operators, Independent Gas Transporters
High impact: Consumers, Shippers, Suppliers

Under UNC TPD, M, 5.9.4, Shippers have 25 Supply Point Systems Business Days (SPSBD) after the read date to submit a read for settlement. Where there's an issue preventing the read from being validated, and that issue is not resolvable within the 25 SPSBD timeframe, the read becomes unusable. This is highly problematic for meter reads that are hard to retrieve. It needs addressing because enabling valid reads to be entered into settlement decreases settlement imbalance, unbilled, Unidentified Gas (No reads at Line in the Sand is a UIG contributor), manual AQ fixes, repeated costs for additional site visits, and time and money spent on must-reads.

Timeline

Raised
Yes
10/07/2023
Panel Assessment
Yes
18/07/2023
Workgroup Report Due
No
18/07/2024
Consultation
Unset
Consultation - Final Modification Report
Unset
18/07/2024
Panel Decision
Unset
Implementation
Unset