0662 - Revenue Recovery at Combined ASEPs

Last updated: 
7 September, 2023
Proposer
Colin Hamilton
Modification type
Authority Direction
Status:
Withdrawn
 09/01/2019
Impact:
High impact: National Transmission System, Rough Storage, Shippers

The purpose of this Modification is to allow entry capacity booked for the entry of gas into the NTS from storage sites within combined Aggregated System Entry Points (ASEPs) to be treated the same as a “Storage Site” as designated in National Grid’s Licence with respect to the application of any revenue recovery charge based on capacity bookings.

Timeline

Raised
Yes
05/07/2018
Status

Initial consideration by Workgroup

Panel Assessment
Unset
Workgroup Report Due
Unset
Consultation
Unset
Consultation - Final Modification Report
Unset
Panel Decision
Unset
Implementation
Unset