0790 - (Urgent) Introduction of a Transmission Services Entry Flow Charge

Last updated: 
11 July, 2023
Proposer
National Grid NTS
Impacted codes
None
Modification type
Urgent
Status:
Rejected
 25/03/2022
Impact:
High impact: National Transmission System, Shippers

This Modification would revise the method of the determination of National Grid Entry Transmission Services Capacity Reference Prices and introduce a new flow-based Transmission Services Entry charge (payable by all Users). The purpose of these changes is to achieve a greater degree of year on year stability in the pricing of Transmission Services Entry Capacity and reduce the overall price differential between Existing Contracts and NonExisting Contracts.

Timeline

Raised
Yes
08/11/2021
Status

Modification Proposal sent to Ofgem

Panel Assessment
Yes
15/11/2021
Status
Ofgem decision on Urgency
Workgroup Report Due
Unset
Consultation
Completed
16/11/2021
06/12/2021
Consultation - Final Modification Report
Yes
09/12/2021
Status

Final Modification Report available for Panel


Panel Decision
Yes
16/12/2021
Status

Modification Panel recommendation

Implementation
Unset