0856 - Introduction of Trials for Non-Daily Metered (NDM) Demand Side Response (DSR)

Last updated: 
20 May, 2024
Current version
3.0
Proposer
National Gas Transmission
Impacted codes
UNC and IGT UNC
Modification type
Authority Direction
Status:
Implemented
Impact:
High impact: Consumers, Distribution Network Operators, Independent Gas Transporters, National Gas Transmission, Shippers

Create a framework to enable National Gas Transmission (NGT) to run time-limited trials for NDM DSR with the aim of gathering data, contributing towards our longer term thinking, allow risks to be better understood and potentially increase the pre-emergency tools available.

Timeline

Raised
Yes
13/09/2023
Panel Assessment
Yes
21/09/2023
Workgroup Report Due
Yes
16/11/2023
Consultation
Completed
17/11/2023
04/12/2023
Consultation - Final Modification Report
Yes
05/12/2023
Panel Decision
Yes
14/12/2023
Implementation
Completed
22/04/2024