Proposer
Steve Mulinganie
Modification type
Authority Direction
Status:
Withdrawn
03/07/2017
Impact:
Low impact: Consumers
Medium impact: Suppliers
High impact: Distribution Network Operators, Rough Storage, Shippers
It is proposed to remove the cross-subsidy that currently exists where shippers pay for shrinkage error losses via Unidentified Gas (UIG) costs, by continuing the corrective payments process that existed prior to Project Nexus that corrected for UIG costs being recovered solely from the SSP sector.
Timeline
Panel Assessment
Unset
Workgroup Report Due
Unset
27/07/2017
Status
Amended Modification considered by Workgroup
Consultation
Completed
17/08/2017
07/09/2017
Consultation - Final Modification Report
Yes
21/09/2017
Status
Final Modification Report available for Panel
Panel Decision
Unset
21/09/2017
Status
Modification Panel decision
Implementation
Unset